How to prepare installation plan for membrane structure engineering?

The preparation of membrane structure installation plan in membrane structure engineering is particularly important as a preliminary preparation work. Below is an introduction on how to prepare a membrane structure installation plan.

According to the membrane structure construction drawings (including steel structure and steel cable installation drawings, membrane unit assembly drawings, sub assembly drawings, and inspection dimension drawings), the design department shall conduct installation technical disclosure to the project management department and form a written installation technical disclosure record.

The installation plan should specify the following in detail:
① Project overview, introduction of construction difficulties.
② Organizational structure of the project management department.
③ Layout and organizational design of construction sites, material warehouses, material storage areas, work sites where membrane units are deployed on the ground, and entry and exit channels for large materials and equipment.
④ Organizational design for secondary handling of engineering materials during installation.
⑤ The specific installation steps and methods for each installation process.
⑥ The layout, displacement, and lifting capacity verification of large lifting equipment.
⑦ The planning and arrangement of construction personnel, personnel allocation for each process and work.
⑧ Supply plan for engineering materials.
⑨ Statistics and allocation plans for large machinery and tool equipment.
⑩ Organizational planning for quality control during the construction process.
⑪ Protection and safety measures for finished or semi-finished products.
⑫ Construction safety measures.
⑩ Schedule of project duration.